S.P.E.E. Iernut
Equipment delivery to SNGN Romgaz S.A. project, consisting in the reahabilitation of the cooling towers from Iernut Power Plant. We provided technical support supervision during the assembly works and staff training regarding the delivered equipment regular inspections.
Vatra Dornei – Separator DN 400 – Termoenergetica SA
The DN 400 Dirt Separator ensures the continuous cleaning of the heating system, removing impurities and excess oxygen. The filtration capacity is up to 1300 m3 / hour. This equipment implemented in a dedicated home ensures the protection of the installation, being produced entirely from stainless steel and with an estimated life span of at […]
The Corner Floreasca, Bucharest
Installation and equipment delivery on site, within a well-known residential project, located in the North side of Bucharest. Here we have provided here a wide range of facilities: Sanitary & Heating: Pumps, Fire pumps sets, Automatic softners Ventilation systems: Air Handling Units
ANA TOWER Offices, Bucharest
Turn-key works for building development. The works consist in developing in less than a year of a 25th Office Building in Bucharest, labeled as a „Green Building”, which consist in : Project design coordination & improvement Full HVAC works Interior and Exterior fresh water distribution system Interior and exterior sanitary system In-between specialties coordination (with […]